Bins: The Pilling are done on both bins; the foundation is done on the east bin as well as the hopper bottom is poured.
Paint & Chip Repair: The crew has patched, and sand blasted the whole elevator and will be back in the Spring when the temps are warm enough to paint.
Photos taken by: CPC Operations Manager, Max Mobley